Negotiable
The date of payment from buyers deliver within days
Sichuan
Long-term effective
2021-07-14 15:36
184
Company Profile
Sichuan Weiyu Electric Co., LtdBy certification [File Integrity]
Contact:weiyu2021(Mr.)
Email:
Telephone:
Phone:
Area:Sichuan
Address:Sichuan
Website:http://www.weeyuevse.com/ http://weiyu2021.tjddhggs.com/
Features:
Power Specification | |||
US Standard |
EU Standard |
||
Charging Connector Type |
SAE J1772 (Type 1) |
IEC 62196-2 (Type 2) |
|
AC Power Input Rating |
AC Level 2, 240V |
230V±15% |
|
Frequency Rating |
50/60 Hz |
||
AC Power Output Rating |
3.5kw/16A |
||
7kw/32A | |||
10kw/40A (US Standard optional) | |||
RCD |
Type B |
||
Environmental | |||
Storage Temperature |
-40 ~ 75℃ |
Operating Temperature |
-30 ~ 55℃ |
Operating Humidity |
Up tp 95%, non-condensing |
Altitude |
≤2000m |
Cooling Method |
Natural Cooling |
||
M3P Wallbox Mechanical | |||
IP Code |
IP65 |
Dimension(H×W×D,mm) |
310×220×95 |
Weight |
7kg |
Charging Cable Length |
5m or Customized |
Enclosure Material |
PC |
||
User Interface & Control |
|||
Wifi |
Yes |
Plug-and-Charging |
Yes |
RFID Card Charging |
Yes |
App Charging |
Yes |
Ethernet Interface |
Yes |
Wifi Function |
Yes |
OCPP Protocol |
OCPP 1.6 |
Load Balance |
Optional |
Protection | |||
Over Voltage Protection |
Yes |
Under Voltage Protection |
Yes |
Over Load Protection |
Yes |
Short Circuit Protection |
Yes |
Earth Leakage Protection |
Yes |
Ground Protection |
Yes |
Over-temp Protection |
Yes |
Surge Protection |
Yes |
RCD |
Type B |
Advantages:
1. APP Control ● Setting Current: you can set the current when the power grid is overload. ● Controlling Stop & Start: Control the Stop &Start by your phone, you can control it in anywhere. ● Booking of Charging:If you want the electric vehicle to be charged in night, it is a good choice that you make an appointment of the charging by APP, it is very convenient. ● Record: you can check the charging record by APP in any time. ● The best Choice for home market. |
2. Load balance management: ● Restricting the total charging load protects the local grid ● Sharing the charging load cuts costs for the required electricity connection ● Choose an open type CT (current transformer) as the current sensor, It is no physical wiring between the devices, which has the advantage of open and close installation, convenient and fast wiring,no extra infrastructure or installation costs. |
3. Specification ● OEM or ODM Available:Logo, brand, design, size, color, function, etc,customization available; ● IP 65:Indoor and outdoor applications with waterproof IP65 rated ● Versatile Installation wall mount or pedestal applications ● Communication: WIFI, LAN(RJ-45),RS-485,OCPP 1.6J |
4. Protection: ● RCD TypeB inside. ● High quality production and design standards for safe and reliable use with multiple fault protection: Overvoltage Protection, Undervoltage Protection, Overload Protection, Short Circuit Protection, Earth leakage Protection, Ground Protection, Over-tempProtection, Surge Protection and etc. |
FAQ
Q1: What is your term of packing of EV Charging point?
A: We pack our EV Charging Point in Eco-friendly cartons,1pcs/Cartons.
Q2: What's the MOQ?
A: Standard EV Chargers are in stock, no MOQ. If you have customized requirements, please contact us. We will provide specific solutions for your requirements.
Q3: How to test OCPP?
A: Send your URL Link to us, then we can communicate with each other by OCPP.
Q4: What is Type 1 and Type 2?
A: Type 1 is US Standard, and Type 2 is European standard.
Q5: Do you test all your goods before delivery?
A: Yes, we have 100% ageing and test before delivery.
Q6: What is the Charging time?
Charging time for 100 km of BEV range [citation needed] | ||||
Power supply |
Power |
Voltage |
Max Current |
Charging time |
Single phase(AC) |
3.3 KW |
230 V AC |
16A |
5-6 hours |
Single phase(AC) |
7.4 KW |
230 V AC |
32A |
2-2.5 hours |
Three phase(AC) |
11 KW |
400 V AC |
16A |
1.5-2 hours |
Three phase(AC) |
22 KW |
400 V AC |
32A |
44-55 minutes |
Three phase(AC) |
43 KW |
400 V AC |
63A |
22-28 minutes |
Direct current (DC) |
50 KW |
400-500 V DC |
100-125 A |
19-24 minutes |
Direct current (DC) |
120 KW |
400-500 V DC |
300-350 A |
8-10 minutes |
http://www.weeyuevse.com/